Stop feeling frustrated. When you cannot find a solution to your access problem, call us.

For more than 50 years the Swing-Lo technology team has been helping people safely and economically reach places no one thought possible. We are ready to do it again. Give us your challenge today.

page19scan-bw-photo2

One of the toughest places to install a scaffold is on an oil rig platform in the sea. One of the easiest solutions is Swing-Lo Oil Rig Platform Scaffold. It safely gets crews up to where the work is on all areas of the platform.

Specialty Scaffolds & Equipment
Solutions to all of your access and safety needs

Most bridges fit certain design parameters. But as long as there are engineers solving problems, there will be design exceptions. Our engineers are ready with solutions for how to access any bridge or structure quickly, easily and safely.

Use our specially designed bypass scaffold system to access bascule bridges. Need to reach fresh concrete road surfaces to do finishing details? The Swing-Lo Median Barrier Scaffold gives your workers a surface to work from. When you need a platform for splicing two girders, the Swing-Lo Beam Splice Scaffold does the job.

One of the toughest-to-reach surfaces is on oil rig platforms, and we have a suspended scaffold solution for them, too.

Whether your crew is working on a bridge over a gorge or on a rig at sea, your crew’s safety is our number-one concern. So we also offer you the fall protection, safety accessories and access equipment you need to keep them safe. Read details below.

MedianBarrierScaffold

Median Barrier Scaffold
Eliminate worker fatigue from hanging over barriers to perform finishing details on fresh concrete road surfaces.

It’s tough getting the last details done on a roadbed once fresh concrete has been poured. But with the Swing-Lo Median Barrier Scaffold you can suspend a working deck from the barrier so your crew can work above the curing concrete. Simply fit clamps over the top of Jersey barrier. Suspend the working deck 12 to 18 inches above the work surface. Then use built-in rollers to move the scaffold along the length of the barrier without leaving the deck. You can even add guardrails to prevent falls.

buffalo-wing

Beam Splice Scaffold
Provide a scaffold for splicing two girders.

This scaffold attaches to the girders before they are raised into position. The upper head assembly clamps over the girder. Vertical stems put the aluminum stage deck right where you need your crew to perform tasks. Guardrails provided upon request.

page19scan-bw-photo1

Oil Rig Platform Scaffold
Save money and time inspecting and maintaining all areas of an oil rig platform.

Oil rig platforms built out in the ocean present some of the toughest access challenges. But Swing-Lo offers a viable, cost-saving solution. Our technology team can custom-design a temporary or permanent, suspended scaffold deck for your application. Contact us with your platform’s parameters and safety equipment needs.

Guardrails, posts, toeboard clamps and fall protection static line clamps
The safety of your crew is our number-one priority.

fal_2fal_3

Your crew can accomplish more when the working conditions are safe. So we offer a full range of products to minimize danger to your personnel. Choose from guardrail posts, guardrails, toeboard clamps and fall protection, static line clamps to create a working environment with fewer hazards and to meet or exceed OSHA standards.

Ladder Clamps
Access equipment gets your workers safely on and off working decks.

Swing-Lo ladder clamps support standard ladder rungs and adjust for various beams and parapets. Just attach a ladder and your crew can get safely to and from the work site.

Solve your access and budget problems with Swing-Lo.

No matter what the design of your bridge. No matter whether you are working over land or out at sea. Swing-Lo can help you reach your work area quickly, safely and cost-efficiently with our Suspended Scaffold Systems and safety equipment. Tell us your needs and we will get working on a cost- and time-saving solution.